A finished renovation isn't actually finished until the construction dust is gone. Drywall dust gets into everything — vents, behind cabinets, on top of doorframes, in window tracks, and in places you won't notice until weeks later when you find it on a high shelf. Jemstone's post-construction clean is built specifically for this — we know where the dust hides, what products are safe on new finishes, and how to avoid scratching freshly painted walls or unsealed flooring.
After any home renovation — kitchen remodel, bathroom remodel, addition, basement finish, whole-house gut, or new construction. Also after smaller projects: refinishing floors, painting interiors, drywall repair. If construction created dust, you need this.
Form or call. For post-construction we'll usually do a quick walkthrough or photos to scope properly.
Best to clean AFTER your final inspection so we don't disturb anything inspectors need to see.
Post-construction is dusty work — we send 2-3 cleaners to finish in one visit (typically 6-10 hours).
For sensitive projects (asthma in the home, very dusty job), we recommend a second visit 2-3 days later to catch resettled dust.
Anytime after your contractor has finished and the space is safe to enter. Best practice: schedule us after your final inspection but before you move furniture or belongings back in.
For most projects, yes. For dusty jobs (gut renos, drywall everywhere), we sometimes recommend a 2-pass clean — initial pass catches 95%, second pass 2-3 days later catches the resettled fine dust.
No — large construction debris (drywall sheets, lumber, old fixtures) is the contractor's responsibility. We handle the dust, residue, and small leftover items.
Yes — we use neutral pH cleaners for new hardwoods, gentle products for unsealed brass and stone, and avoid anything abrasive on new paint. Tell us your specific finishes on the quote form.
A single-room remodel: 3-5 hours. Whole-house gut: 8-12 hours, often split across two visits. We'll quote accurately upfront.